Design, structural work, installation, and finishing — a kitchen renovation is really six smaller projects stacked on top of each other, managed as one by a single team from first visit to a fully tested, finished kitchen.
Tell us what needs doing and we'll come back with a written, itemised quote — no obligation to proceed. Prefer to talk it through in person? We're happy to arrange a free site visit.
A kitchen renovation is really six smaller projects stacked on top of each other, most of them invisible by the time it's finished. The units and worktops are what everyone pictures, but they're the last thing to go in — everything before that is what actually determines whether the finished kitchen works properly for the next fifteen years or starts causing problems within two.
Before anything gets stripped out, a kitchen renovation starts with layout: where the sink sits, whether the fridge door blocks a walkway when it's open, whether an island actually leaves clearance to open every drawer around it. This is also where bespoke kitchen design earns its cost over off-the-shelf cabinetry — units built to the actual dimensions and quirks of a room, rather than a standard size forced to fit a space it was never designed for.
Worth knowing: The most common layout mistake isn't aesthetic, it's practical — a "working triangle" between the hob, sink and fridge that looks fine on paper but means constantly crossing the same three-foot stretch of floor during actual cooking.
Before a single unit is fitted, the plumbing and electrics behind the walls need to be right — moved pipework for a relocated sink, new circuits for the appliances a modern kitchen actually needs, on top of the standard sockets. This stage is invisible in the finished kitchen and is exactly the stage most likely to cause problems later if it's rushed.
Worth knowing: Older London properties often have kitchen circuits that were adequate for a decades-old kitchen and aren't for a modern one — worth checking early, not discovered when a new induction hob trips the whole board.
Not every kitchen renovation involves this phase, but the ones that do — usually opening a kitchen into a dining room or knocking through to create an open-plan layout — need it handled properly and early. Removing a load-bearing wall means a structural calculation and, in most cases, building control sign-off, not just knocking a hole through and fitting a lintel that looks about right.
Worth knowing: This is the phase most likely to affect the overall timeline if it's not planned for from the outset — sorting structural approval after the kitchen's already been designed around an open-plan layout is how projects stall.
This is the visible part — the stage most people mean when they say "kitchen installation." Units go in level and square, which depends entirely on how true the walls and floor actually are, rarely as straightforward as it looks in a showroom, followed by worktops, cut and fitted to the exact dimensions of the finished carcasses rather than the other way round.
Worth knowing: Worktop templating usually happens after the units are fully fitted, not before — a kitchen quoted with a fixed worktop install date before the units are even in is a schedule built on hope.
With units and worktops in place, the plumbing and electrics done in stage two get connected up properly: taps, waste, dishwasher, oven, hob, extractor. This is also when lighting — under-cabinet strips, pendant lights over an island — actually gets wired in and tested, rather than just planned for on a drawing.
Worth knowing: Appliance delivery lead times are a common, avoidable delay — ordering the oven and hob only once the kitchen's ready to receive them is usually too late; they need to be on order weeks before this stage begins.
Splashback tiling, flooring if it's being replaced, final touch-up decorating, and then a proper snag check — every drawer runner tested, every door aligned, every appliance actually run through a cycle before anyone calls it finished.
Worth knowing: A kitchen that looks finished in photos and a kitchen that's actually finished aren't always the same thing — the difference is usually in the details nobody photographs: drawer alignment, silicone sealing, whether every socket's actually been tested.
Style is a genuinely separate decision from layout and structure, and it's worth understanding the trade-offs before committing — because unlike moving a wall, swapping a door style after units are ordered means starting the cabinetry quote from scratch.
Shaker doors — a recessed panel within a simple frame — remain the most requested style in London kitchens, largely because they read as neutral rather than trend-led; a shaker kitchen fitted a decade ago rarely looks dated in the way a heavily grained finish from the same era does. The trade-off is texture: the recessed panel collects dust and grease slightly more than a flat door, which matters more in a busy family kitchen than a quieter one.
Handleless kitchens — either a groove cut into the top of the door or integrated push-to-open mechanisms — read as more contemporary and suit smaller kitchens particularly well, since there's nothing protruding to catch on or narrow a walkway. The trade-off is cost and maintenance: push-to-open mechanisms are a moving part that can wear or need adjustment over years of use, in a way a simple handle never will.
Worktop material is a similarly practical decision dressed up as an aesthetic one — non-porous quartz needs no sealing, granite offers natural variation at the cost of occasional resealing, laminate is the most budget-conscious option, and solid wood looks excellent in period properties but needs the most upkeep.
The areas below are examples, not a complete list. Kay Home Renovation takes on projects right across Greater London, whatever your postcode — if you don't see your area named, get in touch anyway; it's very likely still covered. Whether it's a single room that needs freshening up or a full interior-exterior renovation from start to finish, the same team sees it through, from the first survey to the final handover.
These are examples from each region, not an exhaustive list — Kay Home Renovation covers the whole of Greater London.
Built to last, not just to look finished on handover day.
Real care taken over the quality of the finish, not just the speed of getting it done.
Projects completed to the schedule agreed at the outset, not an optimistic one designed to win the job.
Written, itemised quotes with no inflated figures and no unwelcome surprises once work begins.
The same standard of finish across every trade, not just the ones on show.
Nothing signed off until it's actually right, not just close enough.
Cost depends heavily on scope — a straightforward like-for-like refit sits at a very different price point to a full open-plan renovation involving structural work. A written, itemised quote follows a free visit, with no obligation to proceed.
Often not for a single internal wall in a house, but it depends on whether it's load-bearing (which needs structural sign-off regardless of planning permission) and on the specific property. This gets confirmed during the free visit, before it becomes a surprise mid-project.
A straightforward refit without structural work typically runs two to four weeks. Add an open-plan structural element and it's realistically six to ten weeks, largely dependent on how quickly building control sign-off comes through.
Rarely for more than a few days at a time, particularly once plumbing and electrics are disconnected for the second-fix stage. Worth planning for a temporary setup — kettle, microwave, somewhere to wash up — rather than assuming the kitchen stays partially usable throughout.
Either. Some clients prefer to choose and order units themselves and have us fit them; others want us to project-manage supply as well, sourcing from a trade supplier. Both options are priced separately in the written quote, so it's clear what's covered.
Where a kitchen connects to an existing extension or the rest of the property, flooring, trims and finishes are planned to carry through rather than stop abruptly at a new doorway. This gets discussed at the design stage so the two spaces read as one, not two mismatched builds.